SHOP-FLOOR DIGITALIZATION
Production data, captured at the source
Production data, captured at the source
We capture shop-floor data where it happens, move it into the systems you already run, and automate from there. One process live in four to six weeks.
We capture shop-floor data where it happens, move it into the systems you already run, and automate from there. One process live in four to six weeks.
THE PROBLEM
Production data that arrives late, or not at all
Production data that arrives late, or not at all
On many shop floors, output, scrap and downtime are written on paper and retyped the next morning. The ERP is only as current as the last person who typed.
On many shop floors, output, scrap and downtime are written on paper and retyped the next morning. The ERP is only as current as the last person who typed.
PAPER
Paper on the line
Output, scrap and downtime are written by hand during the shift and collected at the end of it.
LATE
RETYPING
Retyped the next morning
Someone copies the sheets into the ERP the next day. Errors and gaps go in with the data.
DELAY
TRACEABILITY
Traceability by search
Finding which material went into which batch means going through binders and spreadsheets.
MANUAL
REPORTS
Reports built by hand
Certificates and weekly reports are assembled by hand from several sources, every time.
REPEATED
PAPER
Paper on the line
Output, scrap and downtime are written by hand during the shift and collected at the end of it.
LATE
TRACEABILITY
Traceability by search
Finding which material went into which batch means going through binders and spreadsheets.
MANUAL
RETYPING
Retyped the next morning
Someone copies the sheets into the ERP the next day. Errors and gaps go in with the data.
DELAY
REPORTS
Reports built by hand
Certificates and weekly reports are assembled by hand from several sources, every time.
REPEATED
WHAT WE BUILD
Three phases, started one at a time
Three phases, started one at a time
You start with the first phase and decide on the rest once it runs. Each phase builds on the data captured in the one before.
You start with the first phase and decide on the rest once it runs. Each phase builds on the data captured in the one before.
CAPTURE
Operator applications
Tablet and terminal apps for output, scrap and downtime with reasons, batch traceability, quality checks. Offline-first.
INTEGRATE
Into the systems you run
Data goes into your ERP, MES or quality system: Business Central, Odoo, SAP Business One, or direct database and API.
AUTOMATE
Automation from clean data
Material certificates per batch, live production dashboards, scrap against process parameters, reports nobody assembles.
OWNERSHIP
Ownership and security
Senior engineers, direct collaboration, no account layer. ISO 9001 and ISO 27001. Full code ownership for the client.
HOW WE START
One process, live in four to six weeks
One process, live in four to six weeks
A fixed-price first phase: one process, one line, one screen, running in production rather than in a demo. After that, you decide how to continue.
A fixed-price first phase: one process, one line, one screen, running in production rather than in a demo. After that, you decide how to continue.
01)
Scope
We pick one process and one line with you, and agree the fixed price for the first phase.
02)
Build
We build the operator screen for that process, offline-first, with senior engineers you talk to directly.
03)
Run
The screen goes live on the line, in production rather than in a demo, within four to six weeks.
04)
Extend
ERP integration and automation come next, against milestones or with a dedicated team.
01)
Scope
We pick one process and one line with you, and agree the fixed price for the first phase.
02)
Build
We build the operator screen for that process, offline-first, with senior engineers you talk to directly.
03)
Run
The screen goes live on the line, in production rather than in a demo, within four to six weeks.
04)
Extend
ERP integration and automation come next, against milestones or with a dedicated team.
01)
Scope
We pick one process and one line with you, and agree the fixed price for the first phase.
02)
Build
We build the operator screen for that process, offline-first, with senior engineers you talk to directly.
03)
Run
The screen goes live on the line, in production rather than in a demo, within four to six weeks.
04)
Extend
ERP integration and automation come next, against milestones or with a dedicated team.
WHO IT IS FOR
Built for manufacturers of roughly 30 to 250
Built for manufacturers of roughly 30 to 250
Producing to order or in batches, without internal development capacity. What each role on your side gets from it:
Producing to order or in batches, without internal development capacity. What each role on your side gets from it:
Plant Manager
One view of output, scrap and downtime, current during the shift.
Production Manager
Downtime and scrap with reasons, recorded at the line, not reconstructed.
Quality Manager
Quality checks and batch traceability captured with the production record.
Operations Director
Start with one process at a fixed price, extend once it runs.
IT / ERP Manager
Data enters the ERP you already run. No retyping, no system replacement.
CFO
Fixed-price first phase, then milestones. Reports that need no assembly.
Plant Manager
One view of output, scrap and downtime, current during the shift.
IT / ERP Manager
Data enters the ERP you already run. No retyping, no system replacement.
Operations Director
Start with one process at a fixed price, extend once it runs.
Quality Manager
Quality checks and batch traceability captured with the production record.
Production Manager
Downtime and scrap with reasons, recorded at the line, not reconstructed.
CFO
Fixed-price first phase, then milestones. Reports that need no assembly.
Plant Manager
One view of output, scrap and downtime, current during the shift.
Quality Manager
Quality checks and batch traceability captured with the production record.
IT / ERP Manager
Data enters the ERP you already run. No retyping, no system replacement.
Production Manager
Downtime and scrap with reasons, recorded at the line, not reconstructed.
Operations Director
Start with one process at a fixed price, extend once it runs.
CFO
Fixed-price first phase, then milestones. Reports that need no assembly.
OUTCOMES

Operations Director

Operations Director

Production Manager

Production Manager

Plant Manager

Plant Manager
PRICING
MONTHLY
YEARLY
MONTHLY
YEARLY
MONTHLY
YEARLY
FAQ
Common questions
Common questions
If yours is not here, ask us directly.
If yours is not here, ask us directly.
Floating Dots
Shop-floor digitalization for manufacturing
We capture production data at the source, move it into the systems you already run, and automate from there.
Floating Dots
© 2026 Floating Dots SRL
SHOP-FLOOR DIGITALIZATION
Production data, captured at the source
Production data, captured at the source
We capture shop-floor data where it happens, move it into the systems you already run, and automate from there. One process live in four to six weeks.
We capture shop-floor data where it happens, move it into the systems you already run, and automate from there. One process live in four to six weeks.
THE PROBLEM
Production data that arrives late, or not at all
Production data that arrives late, or not at all
On many shop floors, output, scrap and downtime are written on paper and retyped the next morning. The ERP is only as current as the last person who typed.
On many shop floors, output, scrap and downtime are written on paper and retyped the next morning. The ERP is only as current as the last person who typed.
PAPER
Paper on the line
Output, scrap and downtime are written by hand during the shift and collected at the end of it.
LATE
RETYPING
Retyped the next morning
Someone copies the sheets into the ERP the next day. Errors and gaps go in with the data.
DELAY
TRACEABILITY
Traceability by search
Finding which material went into which batch means going through binders and spreadsheets.
MANUAL
REPORTS
Reports built by hand
Certificates and weekly reports are assembled by hand from several sources, every time.
REPEATED
PAPER
Paper on the line
Output, scrap and downtime are written by hand during the shift and collected at the end of it.
LATE
TRACEABILITY
Traceability by search
Finding which material went into which batch means going through binders and spreadsheets.
MANUAL
RETYPING
Retyped the next morning
Someone copies the sheets into the ERP the next day. Errors and gaps go in with the data.
DELAY
REPORTS
Reports built by hand
Certificates and weekly reports are assembled by hand from several sources, every time.
REPEATED
WHAT WE BUILD
Three phases, started one at a time
Three phases, started one at a time
You start with the first phase and decide on the rest once it runs. Each phase builds on the data captured in the one before.
You start with the first phase and decide on the rest once it runs. Each phase builds on the data captured in the one before.
CAPTURE
Operator applications
Tablet and terminal apps for output, scrap and downtime with reasons, batch traceability, quality checks. Offline-first.
INTEGRATE
Into the systems you run
Data goes into your ERP, MES or quality system: Business Central, Odoo, SAP Business One, or direct database and API.
AUTOMATE
Automation from clean data
Material certificates per batch, live production dashboards, scrap against process parameters, reports nobody assembles.
OWNERSHIP
Ownership and security
Senior engineers, direct collaboration, no account layer. ISO 9001 and ISO 27001. Full code ownership for the client.
HOW WE START
One process, live in four to six weeks
One process, live in four to six weeks
A fixed-price first phase: one process, one line, one screen, running in production rather than in a demo. After that, you decide how to continue.
A fixed-price first phase: one process, one line, one screen, running in production rather than in a demo. After that, you decide how to continue.
01)
Scope
We pick one process and one line with you, and agree the fixed price for the first phase.
02)
Build
We build the operator screen for that process, offline-first, with senior engineers you talk to directly.
03)
Run
The screen goes live on the line, in production rather than in a demo, within four to six weeks.
04)
Extend
ERP integration and automation come next, against milestones or with a dedicated team.
01)
Scope
We pick one process and one line with you, and agree the fixed price for the first phase.
02)
Build
We build the operator screen for that process, offline-first, with senior engineers you talk to directly.
03)
Run
The screen goes live on the line, in production rather than in a demo, within four to six weeks.
04)
Extend
ERP integration and automation come next, against milestones or with a dedicated team.
01)
Scope
We pick one process and one line with you, and agree the fixed price for the first phase.
02)
Build
We build the operator screen for that process, offline-first, with senior engineers you talk to directly.
03)
Run
The screen goes live on the line, in production rather than in a demo, within four to six weeks.
04)
Extend
ERP integration and automation come next, against milestones or with a dedicated team.
WHO IT IS FOR
Built for manufacturers of roughly 30 to 250
Built for manufacturers of roughly 30 to 250
Producing to order or in batches, without internal development capacity. What each role on your side gets from it:
Producing to order or in batches, without internal development capacity. What each role on your side gets from it:
Plant Manager
One view of output, scrap and downtime, current during the shift.
Production Manager
Downtime and scrap with reasons, recorded at the line, not reconstructed.
Quality Manager
Quality checks and batch traceability captured with the production record.
Operations Director
Start with one process at a fixed price, extend once it runs.
IT / ERP Manager
Data enters the ERP you already run. No retyping, no system replacement.
CFO
Fixed-price first phase, then milestones. Reports that need no assembly.
Plant Manager
One view of output, scrap and downtime, current during the shift.
IT / ERP Manager
Data enters the ERP you already run. No retyping, no system replacement.
Operations Director
Start with one process at a fixed price, extend once it runs.
Quality Manager
Quality checks and batch traceability captured with the production record.
Production Manager
Downtime and scrap with reasons, recorded at the line, not reconstructed.
CFO
Fixed-price first phase, then milestones. Reports that need no assembly.
Plant Manager
One view of output, scrap and downtime, current during the shift.
Quality Manager
Quality checks and batch traceability captured with the production record.
IT / ERP Manager
Data enters the ERP you already run. No retyping, no system replacement.
Production Manager
Downtime and scrap with reasons, recorded at the line, not reconstructed.
Operations Director
Start with one process at a fixed price, extend once it runs.
CFO
Fixed-price first phase, then milestones. Reports that need no assembly.
OUTCOMES

Operations Director

Operations Director

Production Manager

Production Manager

Plant Manager

Plant Manager
PRICING
MONTHLY
YEARLY
MONTHLY
YEARLY
MONTHLY
YEARLY
FAQ
Common questions
Common questions
If yours is not here, ask us directly.
If yours is not here, ask us directly.
Floating Dots
Shop-floor digitalization for manufacturing
We capture production data at the source, move it into the systems you already run, and automate from there.
Floating Dots
© 2026 Floating Dots SRL
SHOP-FLOOR DIGITALIZATION
Production data, captured at the source
Production data, captured at the source
We capture shop-floor data where it happens, move it into the systems you already run, and automate from there. One process live in four to six weeks.
We capture shop-floor data where it happens, move it into the systems you already run, and automate from there. One process live in four to six weeks.
THE PROBLEM
Production data that arrives late, or not at all
Production data that arrives late, or not at all
On many shop floors, output, scrap and downtime are written on paper and retyped the next morning. The ERP is only as current as the last person who typed.
On many shop floors, output, scrap and downtime are written on paper and retyped the next morning. The ERP is only as current as the last person who typed.
PAPER
Paper on the line
Output, scrap and downtime are written by hand during the shift and collected at the end of it.
LATE
RETYPING
Retyped the next morning
Someone copies the sheets into the ERP the next day. Errors and gaps go in with the data.
DELAY
TRACEABILITY
Traceability by search
Finding which material went into which batch means going through binders and spreadsheets.
MANUAL
REPORTS
Reports built by hand
Certificates and weekly reports are assembled by hand from several sources, every time.
REPEATED
PAPER
Paper on the line
Output, scrap and downtime are written by hand during the shift and collected at the end of it.
LATE
TRACEABILITY
Traceability by search
Finding which material went into which batch means going through binders and spreadsheets.
MANUAL
RETYPING
Retyped the next morning
Someone copies the sheets into the ERP the next day. Errors and gaps go in with the data.
DELAY
REPORTS
Reports built by hand
Certificates and weekly reports are assembled by hand from several sources, every time.
REPEATED
WHAT WE BUILD
Three phases, started one at a time
Three phases, started one at a time
You start with the first phase and decide on the rest once it runs. Each phase builds on the data captured in the one before.
You start with the first phase and decide on the rest once it runs. Each phase builds on the data captured in the one before.
CAPTURE
Operator applications
Tablet and terminal apps for output, scrap and downtime with reasons, batch traceability, quality checks. Offline-first.
INTEGRATE
Into the systems you run
Data goes into your ERP, MES or quality system: Business Central, Odoo, SAP Business One, or direct database and API.
AUTOMATE
Automation from clean data
Material certificates per batch, live production dashboards, scrap against process parameters, reports nobody assembles.
OWNERSHIP
Ownership and security
Senior engineers, direct collaboration, no account layer. ISO 9001 and ISO 27001. Full code ownership for the client.
HOW WE START
One process, live in four to six weeks
One process, live in four to six weeks
A fixed-price first phase: one process, one line, one screen, running in production rather than in a demo. After that, you decide how to continue.
A fixed-price first phase: one process, one line, one screen, running in production rather than in a demo. After that, you decide how to continue.
01)
Scope
We pick one process and one line with you, and agree the fixed price for the first phase.
02)
Build
We build the operator screen for that process, offline-first, with senior engineers you talk to directly.
03)
Run
The screen goes live on the line, in production rather than in a demo, within four to six weeks.
04)
Extend
ERP integration and automation come next, against milestones or with a dedicated team.
01)
Scope
We pick one process and one line with you, and agree the fixed price for the first phase.
02)
Build
We build the operator screen for that process, offline-first, with senior engineers you talk to directly.
03)
Run
The screen goes live on the line, in production rather than in a demo, within four to six weeks.
04)
Extend
ERP integration and automation come next, against milestones or with a dedicated team.
01)
Scope
We pick one process and one line with you, and agree the fixed price for the first phase.
02)
Build
We build the operator screen for that process, offline-first, with senior engineers you talk to directly.
03)
Run
The screen goes live on the line, in production rather than in a demo, within four to six weeks.
04)
Extend
ERP integration and automation come next, against milestones or with a dedicated team.
WHO IT IS FOR
Built for manufacturers of roughly 30 to 250
Built for manufacturers of roughly 30 to 250
Producing to order or in batches, without internal development capacity. What each role on your side gets from it:
Producing to order or in batches, without internal development capacity. What each role on your side gets from it:
Plant Manager
One view of output, scrap and downtime, current during the shift.
Production Manager
Downtime and scrap with reasons, recorded at the line, not reconstructed.
Quality Manager
Quality checks and batch traceability captured with the production record.
Operations Director
Start with one process at a fixed price, extend once it runs.
IT / ERP Manager
Data enters the ERP you already run. No retyping, no system replacement.
CFO
Fixed-price first phase, then milestones. Reports that need no assembly.
Plant Manager
One view of output, scrap and downtime, current during the shift.
IT / ERP Manager
Data enters the ERP you already run. No retyping, no system replacement.
Operations Director
Start with one process at a fixed price, extend once it runs.
Quality Manager
Quality checks and batch traceability captured with the production record.
Production Manager
Downtime and scrap with reasons, recorded at the line, not reconstructed.
CFO
Fixed-price first phase, then milestones. Reports that need no assembly.
Plant Manager
One view of output, scrap and downtime, current during the shift.
Quality Manager
Quality checks and batch traceability captured with the production record.
IT / ERP Manager
Data enters the ERP you already run. No retyping, no system replacement.
Production Manager
Downtime and scrap with reasons, recorded at the line, not reconstructed.
Operations Director
Start with one process at a fixed price, extend once it runs.
CFO
Fixed-price first phase, then milestones. Reports that need no assembly.
OUTCOMES

Operations Director

Operations Director

Production Manager

Production Manager

Plant Manager

Plant Manager
PRICING
MONTHLY
YEARLY
MONTHLY
YEARLY
MONTHLY
YEARLY
FAQ
Common questions
Common questions
If yours is not here, ask us directly.
If yours is not here, ask us directly.
Floating Dots
Shop-floor digitalization for manufacturing
We capture production data at the source, move it into the systems you already run, and automate from there.
Floating Dots
© 2026 Floating Dots SRL








