SHOP-FLOOR DIGITALIZATION

Production data, captured at the source

Production data, captured at the source

We capture shop-floor data where it happens, move it into the systems you already run, and automate from there. One process live in four to six weeks.

We capture shop-floor data where it happens, move it into the systems you already run, and automate from there. One process live in four to six weeks.

THE PROBLEM

Production data that arrives late, or not at all

Production data that arrives late, or not at all

On many shop floors, output, scrap and downtime are written on paper and retyped the next morning. The ERP is only as current as the last person who typed.

On many shop floors, output, scrap and downtime are written on paper and retyped the next morning. The ERP is only as current as the last person who typed.

PAPER

Paper on the line

Output, scrap and downtime are written by hand during the shift and collected at the end of it.

1 shift

LATE

RETYPING

Retyped the next morning

Someone copies the sheets into the ERP the next day. Errors and gaps go in with the data.

1 day

DELAY

TRACEABILITY

Traceability by search

Finding which material went into which batch means going through binders and spreadsheets.

1 batch

MANUAL

REPORTS

Reports built by hand

Certificates and weekly reports are assembled by hand from several sources, every time.

0

REPEATED

PAPER

Paper on the line

Output, scrap and downtime are written by hand during the shift and collected at the end of it.

1 shift

LATE

TRACEABILITY

Traceability by search

Finding which material went into which batch means going through binders and spreadsheets.

1 batch

MANUAL

RETYPING

Retyped the next morning

Someone copies the sheets into the ERP the next day. Errors and gaps go in with the data.

1 day

DELAY

REPORTS

Reports built by hand

Certificates and weekly reports are assembled by hand from several sources, every time.

0

REPEATED

WHAT WE BUILD

Three phases, started one at a time

Three phases, started one at a time

You start with the first phase and decide on the rest once it runs. Each phase builds on the data captured in the one before.

You start with the first phase and decide on the rest once it runs. Each phase builds on the data captured in the one before.

CAPTURE

Operator applications

Tablet and terminal apps for output, scrap and downtime with reasons, batch traceability, quality checks. Offline-first.

INTEGRATE

Into the systems you run

Data goes into your ERP, MES or quality system: Business Central, Odoo, SAP Business One, or direct database and API.

AUTOMATE

Automation from clean data

Material certificates per batch, live production dashboards, scrap against process parameters, reports nobody assembles.

OWNERSHIP

Ownership and security

Senior engineers, direct collaboration, no account layer. ISO 9001 and ISO 27001. Full code ownership for the client.

HOW WE START

One process, live in four to six weeks

One process, live in four to six weeks

A fixed-price first phase: one process, one line, one screen, running in production rather than in a demo. After that, you decide how to continue.

A fixed-price first phase: one process, one line, one screen, running in production rather than in a demo. After that, you decide how to continue.

01)

Scope

We pick one process and one line with you, and agree the fixed price for the first phase.

02)

Build

We build the operator screen for that process, offline-first, with senior engineers you talk to directly.

03)

Run

The screen goes live on the line, in production rather than in a demo, within four to six weeks.

04)

Extend

ERP integration and automation come next, against milestones or with a dedicated team.

01)

Scope

We pick one process and one line with you, and agree the fixed price for the first phase.

02)

Build

We build the operator screen for that process, offline-first, with senior engineers you talk to directly.

03)

Run

The screen goes live on the line, in production rather than in a demo, within four to six weeks.

04)

Extend

ERP integration and automation come next, against milestones or with a dedicated team.

01)

Scope

We pick one process and one line with you, and agree the fixed price for the first phase.

02)

Build

We build the operator screen for that process, offline-first, with senior engineers you talk to directly.

03)

Run

The screen goes live on the line, in production rather than in a demo, within four to six weeks.

04)

Extend

ERP integration and automation come next, against milestones or with a dedicated team.

WHO IT IS FOR

Built for manufacturers of roughly 30 to 250

Built for manufacturers of roughly 30 to 250

Producing to order or in batches, without internal development capacity. What each role on your side gets from it:

Producing to order or in batches, without internal development capacity. What each role on your side gets from it:

Plant Manager

One view of output, scrap and downtime, current during the shift.

Production Manager

Downtime and scrap with reasons, recorded at the line, not reconstructed.

Quality Manager

Quality checks and batch traceability captured with the production record.

Operations Director

Start with one process at a fixed price, extend once it runs.

IT / ERP Manager

Data enters the ERP you already run. No retyping, no system replacement.

CFO

Fixed-price first phase, then milestones. Reports that need no assembly.

Plant Manager

One view of output, scrap and downtime, current during the shift.

IT / ERP Manager

Data enters the ERP you already run. No retyping, no system replacement.

Operations Director

Start with one process at a fixed price, extend once it runs.

Quality Manager

Quality checks and batch traceability captured with the production record.

Production Manager

Downtime and scrap with reasons, recorded at the line, not reconstructed.

CFO

Fixed-price first phase, then milestones. Reports that need no assembly.

Plant Manager

One view of output, scrap and downtime, current during the shift.

Quality Manager

Quality checks and batch traceability captured with the production record.

IT / ERP Manager

Data enters the ERP you already run. No retyping, no system replacement.

Production Manager

Downtime and scrap with reasons, recorded at the line, not reconstructed.

Operations Director

Start with one process at a fixed price, extend once it runs.

CFO

Fixed-price first phase, then milestones. Reports that need no assembly.

0%

0%

0.8%

0min

  • man in white dress shirt

    Operations Director

    man in white dress shirt

    Operations Director

  • woman in black crew neck t-shirt

    Production Manager

    woman in black crew neck t-shirt

    Production Manager

  • man in green crew neck shirt and black hat

    Plant Manager

    man in green crew neck shirt and black hat

    Plant Manager

  • a woman in a black suit and sunglasses

    a woman in a black suit and sunglasses

  • man wearing eyeglasses and sleeveless top

    man wearing eyeglasses and sleeveless top

  • woman in white near calm body of water

    woman in white near calm body of water

PRICING

MONTHLY

YEARLY

Starter

Enterprise

Custom

MONTHLY

YEARLY

Starter

Enterprise

Custom

MONTHLY

YEARLY

Starter

Enterprise

Custom

FAQ

Common questions

Common questions

If yours is not here, ask us directly.

If yours is not here, ask us directly.

Floating Dots

Shop-floor digitalization for manufacturing

We capture production data at the source, move it into the systems you already run, and automate from there.

SHOP-FLOOR DIGITALIZATION

Production data, captured at the source

Production data, captured at the source

We capture shop-floor data where it happens, move it into the systems you already run, and automate from there. One process live in four to six weeks.

We capture shop-floor data where it happens, move it into the systems you already run, and automate from there. One process live in four to six weeks.

THE PROBLEM

Production data that arrives late, or not at all

Production data that arrives late, or not at all

On many shop floors, output, scrap and downtime are written on paper and retyped the next morning. The ERP is only as current as the last person who typed.

On many shop floors, output, scrap and downtime are written on paper and retyped the next morning. The ERP is only as current as the last person who typed.

PAPER

Paper on the line

Output, scrap and downtime are written by hand during the shift and collected at the end of it.

1 shift

LATE

RETYPING

Retyped the next morning

Someone copies the sheets into the ERP the next day. Errors and gaps go in with the data.

1 day

DELAY

TRACEABILITY

Traceability by search

Finding which material went into which batch means going through binders and spreadsheets.

1 batch

MANUAL

REPORTS

Reports built by hand

Certificates and weekly reports are assembled by hand from several sources, every time.

0

REPEATED

PAPER

Paper on the line

Output, scrap and downtime are written by hand during the shift and collected at the end of it.

1 shift

LATE

TRACEABILITY

Traceability by search

Finding which material went into which batch means going through binders and spreadsheets.

1 batch

MANUAL

RETYPING

Retyped the next morning

Someone copies the sheets into the ERP the next day. Errors and gaps go in with the data.

1 day

DELAY

REPORTS

Reports built by hand

Certificates and weekly reports are assembled by hand from several sources, every time.

0

REPEATED

WHAT WE BUILD

Three phases, started one at a time

Three phases, started one at a time

You start with the first phase and decide on the rest once it runs. Each phase builds on the data captured in the one before.

You start with the first phase and decide on the rest once it runs. Each phase builds on the data captured in the one before.

CAPTURE

Operator applications

Tablet and terminal apps for output, scrap and downtime with reasons, batch traceability, quality checks. Offline-first.

INTEGRATE

Into the systems you run

Data goes into your ERP, MES or quality system: Business Central, Odoo, SAP Business One, or direct database and API.

AUTOMATE

Automation from clean data

Material certificates per batch, live production dashboards, scrap against process parameters, reports nobody assembles.

OWNERSHIP

Ownership and security

Senior engineers, direct collaboration, no account layer. ISO 9001 and ISO 27001. Full code ownership for the client.

HOW WE START

One process, live in four to six weeks

One process, live in four to six weeks

A fixed-price first phase: one process, one line, one screen, running in production rather than in a demo. After that, you decide how to continue.

A fixed-price first phase: one process, one line, one screen, running in production rather than in a demo. After that, you decide how to continue.

01)

Scope

We pick one process and one line with you, and agree the fixed price for the first phase.

02)

Build

We build the operator screen for that process, offline-first, with senior engineers you talk to directly.

03)

Run

The screen goes live on the line, in production rather than in a demo, within four to six weeks.

04)

Extend

ERP integration and automation come next, against milestones or with a dedicated team.

01)

Scope

We pick one process and one line with you, and agree the fixed price for the first phase.

02)

Build

We build the operator screen for that process, offline-first, with senior engineers you talk to directly.

03)

Run

The screen goes live on the line, in production rather than in a demo, within four to six weeks.

04)

Extend

ERP integration and automation come next, against milestones or with a dedicated team.

01)

Scope

We pick one process and one line with you, and agree the fixed price for the first phase.

02)

Build

We build the operator screen for that process, offline-first, with senior engineers you talk to directly.

03)

Run

The screen goes live on the line, in production rather than in a demo, within four to six weeks.

04)

Extend

ERP integration and automation come next, against milestones or with a dedicated team.

WHO IT IS FOR

Built for manufacturers of roughly 30 to 250

Built for manufacturers of roughly 30 to 250

Producing to order or in batches, without internal development capacity. What each role on your side gets from it:

Producing to order or in batches, without internal development capacity. What each role on your side gets from it:

Plant Manager

One view of output, scrap and downtime, current during the shift.

Production Manager

Downtime and scrap with reasons, recorded at the line, not reconstructed.

Quality Manager

Quality checks and batch traceability captured with the production record.

Operations Director

Start with one process at a fixed price, extend once it runs.

IT / ERP Manager

Data enters the ERP you already run. No retyping, no system replacement.

CFO

Fixed-price first phase, then milestones. Reports that need no assembly.

Plant Manager

One view of output, scrap and downtime, current during the shift.

IT / ERP Manager

Data enters the ERP you already run. No retyping, no system replacement.

Operations Director

Start with one process at a fixed price, extend once it runs.

Quality Manager

Quality checks and batch traceability captured with the production record.

Production Manager

Downtime and scrap with reasons, recorded at the line, not reconstructed.

CFO

Fixed-price first phase, then milestones. Reports that need no assembly.

Plant Manager

One view of output, scrap and downtime, current during the shift.

Quality Manager

Quality checks and batch traceability captured with the production record.

IT / ERP Manager

Data enters the ERP you already run. No retyping, no system replacement.

Production Manager

Downtime and scrap with reasons, recorded at the line, not reconstructed.

Operations Director

Start with one process at a fixed price, extend once it runs.

CFO

Fixed-price first phase, then milestones. Reports that need no assembly.

0%

0%

0.8%

0min

  • man in white dress shirt

    Operations Director

    man in white dress shirt

    Operations Director

  • woman in black crew neck t-shirt

    Production Manager

    woman in black crew neck t-shirt

    Production Manager

  • man in green crew neck shirt and black hat

    Plant Manager

    man in green crew neck shirt and black hat

    Plant Manager

  • a woman in a black suit and sunglasses

    a woman in a black suit and sunglasses

  • man wearing eyeglasses and sleeveless top

    man wearing eyeglasses and sleeveless top

  • woman in white near calm body of water

    woman in white near calm body of water

PRICING

MONTHLY

YEARLY

Starter

Enterprise

Custom

MONTHLY

YEARLY

Starter

Enterprise

Custom

MONTHLY

YEARLY

Starter

Enterprise

Custom

FAQ

Common questions

Common questions

If yours is not here, ask us directly.

If yours is not here, ask us directly.

Floating Dots

Shop-floor digitalization for manufacturing

We capture production data at the source, move it into the systems you already run, and automate from there.

SHOP-FLOOR DIGITALIZATION

Production data, captured at the source

Production data, captured at the source

We capture shop-floor data where it happens, move it into the systems you already run, and automate from there. One process live in four to six weeks.

We capture shop-floor data where it happens, move it into the systems you already run, and automate from there. One process live in four to six weeks.

THE PROBLEM

Production data that arrives late, or not at all

Production data that arrives late, or not at all

On many shop floors, output, scrap and downtime are written on paper and retyped the next morning. The ERP is only as current as the last person who typed.

On many shop floors, output, scrap and downtime are written on paper and retyped the next morning. The ERP is only as current as the last person who typed.

PAPER

Paper on the line

Output, scrap and downtime are written by hand during the shift and collected at the end of it.

1 shift

LATE

RETYPING

Retyped the next morning

Someone copies the sheets into the ERP the next day. Errors and gaps go in with the data.

1 day

DELAY

TRACEABILITY

Traceability by search

Finding which material went into which batch means going through binders and spreadsheets.

1 batch

MANUAL

REPORTS

Reports built by hand

Certificates and weekly reports are assembled by hand from several sources, every time.

0

REPEATED

PAPER

Paper on the line

Output, scrap and downtime are written by hand during the shift and collected at the end of it.

1 shift

LATE

TRACEABILITY

Traceability by search

Finding which material went into which batch means going through binders and spreadsheets.

1 batch

MANUAL

RETYPING

Retyped the next morning

Someone copies the sheets into the ERP the next day. Errors and gaps go in with the data.

1 day

DELAY

REPORTS

Reports built by hand

Certificates and weekly reports are assembled by hand from several sources, every time.

0

REPEATED

WHAT WE BUILD

Three phases, started one at a time

Three phases, started one at a time

You start with the first phase and decide on the rest once it runs. Each phase builds on the data captured in the one before.

You start with the first phase and decide on the rest once it runs. Each phase builds on the data captured in the one before.

CAPTURE

Operator applications

Tablet and terminal apps for output, scrap and downtime with reasons, batch traceability, quality checks. Offline-first.

INTEGRATE

Into the systems you run

Data goes into your ERP, MES or quality system: Business Central, Odoo, SAP Business One, or direct database and API.

AUTOMATE

Automation from clean data

Material certificates per batch, live production dashboards, scrap against process parameters, reports nobody assembles.

OWNERSHIP

Ownership and security

Senior engineers, direct collaboration, no account layer. ISO 9001 and ISO 27001. Full code ownership for the client.

HOW WE START

One process, live in four to six weeks

One process, live in four to six weeks

A fixed-price first phase: one process, one line, one screen, running in production rather than in a demo. After that, you decide how to continue.

A fixed-price first phase: one process, one line, one screen, running in production rather than in a demo. After that, you decide how to continue.

01)

Scope

We pick one process and one line with you, and agree the fixed price for the first phase.

02)

Build

We build the operator screen for that process, offline-first, with senior engineers you talk to directly.

03)

Run

The screen goes live on the line, in production rather than in a demo, within four to six weeks.

04)

Extend

ERP integration and automation come next, against milestones or with a dedicated team.

01)

Scope

We pick one process and one line with you, and agree the fixed price for the first phase.

02)

Build

We build the operator screen for that process, offline-first, with senior engineers you talk to directly.

03)

Run

The screen goes live on the line, in production rather than in a demo, within four to six weeks.

04)

Extend

ERP integration and automation come next, against milestones or with a dedicated team.

01)

Scope

We pick one process and one line with you, and agree the fixed price for the first phase.

02)

Build

We build the operator screen for that process, offline-first, with senior engineers you talk to directly.

03)

Run

The screen goes live on the line, in production rather than in a demo, within four to six weeks.

04)

Extend

ERP integration and automation come next, against milestones or with a dedicated team.

WHO IT IS FOR

Built for manufacturers of roughly 30 to 250

Built for manufacturers of roughly 30 to 250

Producing to order or in batches, without internal development capacity. What each role on your side gets from it:

Producing to order or in batches, without internal development capacity. What each role on your side gets from it:

Plant Manager

One view of output, scrap and downtime, current during the shift.

Production Manager

Downtime and scrap with reasons, recorded at the line, not reconstructed.

Quality Manager

Quality checks and batch traceability captured with the production record.

Operations Director

Start with one process at a fixed price, extend once it runs.

IT / ERP Manager

Data enters the ERP you already run. No retyping, no system replacement.

CFO

Fixed-price first phase, then milestones. Reports that need no assembly.

Plant Manager

One view of output, scrap and downtime, current during the shift.

IT / ERP Manager

Data enters the ERP you already run. No retyping, no system replacement.

Operations Director

Start with one process at a fixed price, extend once it runs.

Quality Manager

Quality checks and batch traceability captured with the production record.

Production Manager

Downtime and scrap with reasons, recorded at the line, not reconstructed.

CFO

Fixed-price first phase, then milestones. Reports that need no assembly.

Plant Manager

One view of output, scrap and downtime, current during the shift.

Quality Manager

Quality checks and batch traceability captured with the production record.

IT / ERP Manager

Data enters the ERP you already run. No retyping, no system replacement.

Production Manager

Downtime and scrap with reasons, recorded at the line, not reconstructed.

Operations Director

Start with one process at a fixed price, extend once it runs.

CFO

Fixed-price first phase, then milestones. Reports that need no assembly.

0%

0%

0.8%

0min

  • man in white dress shirt

    Operations Director

    man in white dress shirt

    Operations Director

  • woman in black crew neck t-shirt

    Production Manager

    woman in black crew neck t-shirt

    Production Manager

  • man in green crew neck shirt and black hat

    Plant Manager

    man in green crew neck shirt and black hat

    Plant Manager

  • a woman in a black suit and sunglasses

    a woman in a black suit and sunglasses

  • man wearing eyeglasses and sleeveless top

    man wearing eyeglasses and sleeveless top

  • woman in white near calm body of water

    woman in white near calm body of water

PRICING

MONTHLY

YEARLY

Starter

Enterprise

Custom

MONTHLY

YEARLY

Starter

Enterprise

Custom

MONTHLY

YEARLY

Starter

Enterprise

Custom

FAQ

Common questions

Common questions

If yours is not here, ask us directly.

If yours is not here, ask us directly.

Floating Dots

Shop-floor digitalization for manufacturing

We capture production data at the source, move it into the systems you already run, and automate from there.